New Style Lower Price Chinese manufacture Dry Bulk Cement Silo Tank Powder Material Tanker Bulk Cement Tank

FOB Price: $10000
Min.Order Quantity: 1
Supply Ability: 50t/h
SPort: zhengzhou
Payment Terms: FOB

Product Details

Spread here

New Style Lower Price Chinese manufacture Dry Bulk Cement Silo Tank Powder Material Tanker Bulk Cement Tank

Introduction 

Cement silo has the following parts: the silo body steel structure part, the ladder, guardrail, feeding tube, dust collector, pressure relief valve, high and low level meter, the discharge valve, etc The cement silo has a cylindrical structure, and the bottom is supported by four round tube legs. The whole silo is in the form of steel structure and welded; the top is provided with a dust collector and a pressure safety valve.

Operation process
1, When the bulk mud warehouse work, it must be erected by a special crane, and then placed on the pre-precast concrete foundation, and check the vertical degree of the cement warehouse after standing up with the horizontal plane, and then the bottom and the foundation embedded parts welded firmly.
2. After the storage bin is fixed, the cement is transported to the site by the bulk cement truck, and then the conveying pipeline of the bulk cement truck is connected with the feed pipeline of the cement bin (cement tank), and the cement in the tank is transported to the cement bin (cement tank) through the gas pressure of the bulk cement truck.
3, In the process of conveying cement to the storage bin, the operator continuously presses the button of the vibration motor of the dust collector to shake off the cement attached to the dust collector bag to prevent blocking the bag and the explosion of the bin.
4. Once the bag is blocked, the pressure in the bin exceeds the safety pressure of the top pressure safety valve, and the pressure safety valve can be opened to release the pressure in the bin and prevent the occurrence of the explosion accident.
5, Through the high and low material level can observe the warehouse full and lack of material.
6, When it is necessary to discharge the material, first open the manual discharge valve at the bottom of the cone, and then transport the cement out through the cement conveying device (screw conveyor). In the process of discharging, if there is a “arch” phenomenon, press the button of the electromagnetic valve of the arch breaking device in time, blow air, eliminate the “arch” for feeding, and ensure the smooth supply of cement.
7. When the cement conveying device (screw conveyor) fails, first close the manual discharge valve at the bottom of the cone to prevent cement overflow and waste.

Main Parameter 

Model Diameter(m) Height (m) Thickness Outrigger(m)
30t 3 6m U4,M5,D6mm 1m
50t 3 7.5m U4,M5,D6mm 1m
60t 3 8.5m U4,M5,D6mm 1m
80t 3 10.5m U4,M5,D6mm 1m
100t 3 12.5m U4,M5,D6mm 1m
120t 3 15.5m U4,M5,D6mm 1m

Parets name

Name
Cement silo
Climbing stairs
Unloading valve
Arch breaking device
Protective fence

Group rotary level gauge

Feeding tube diameter 103
Observation hole
Dust collector
Leg support

cement tank (1)cement tank (2)cement tank (7)cement tank (1)cement tank (10)cement tank (3)